Happy Monday! I am literally sitting on a goldmine of updates for you, but I just haven’t had the time energy to blog. Perhaps it’s the 24-hour-a-day clouds. #justaguess
We have had a lot of progress in the basement, however. My declaration? Tile takes forever. The. End.
So the big dog here is the bathroom. My husband and father-in-law worked tirelessly to get this up, and I’m pretty smitten with it. The basement is considered my husband’s space (I hate the term man cave), so it has a very masculine tone to it.
It’s a small bathroom, but man does it have a lot of function! We went with a shower, urinal, toilet, and single sink/vanity. We live away from all of our family, and my kids worship sleepovers. We wanted to make sure there was a full bathroom to accommodate all of them.
Small space meant trying to keep the lines as clean as possible. So I had the floor tile run all the way up the shower wall.
Now that the tile is complete, we’re moving onto other details! My favorite is this square wainscotting we’re doing on the stairwell walls. It adds some dimension to the space, eh?
There’s a little peek of the new floor, but that’s going to be another post(s). I’m in a deep, loving relationship with it, and I can’t recommend it enough. I’ll be back with more pictures! Perhaps I’ll even use an actual camera then, too. #iphonejunkie